Pope Army Airfield Runway & Assault Strip

Next Project
Pope Army Airfield

This rehabilitation project included resurfacing of the main runway at the Pope Army Airfield. Treated as an emergency repair project, the job included milling 190,000 SY of asphalt, installing a test strip and paving the entire runway. The project was completed during a 30-day shut down of the airstrip, and was delivered five days ahead of schedule.

  • Pope Army Airfield
Pope Army Airfield

Other Projects

  • Elizabeth City Regional Airport
  • Albert J. Ellis Airport Terminal
  • Albert J. Ellis Airport Runway
  • Wilmington International Airport Taxiway Rehabilitation